Fridge, Stove, Dishwasher, washer and dryer, microwave, ELFS, Blinds, Drapery, and Drapery hardware, All new electrical completed in 2020, including removal of all knob-and-tube wiring, Pot lights added throughout the house, New boiler installed in 2016, New water heater installed in 2016, New backwater valve installed in 2010, New roof on the main house completed in 2020, New garage roof completed in 2022, New gutters and downspouts installed on the house (first floor) and garage in 2026, New washer and dryer installed in 2023New A/C and heating unit installed in 2026